{"id":3432,"date":"2018-09-26T10:30:33","date_gmt":"2018-09-26T14:30:33","guid":{"rendered":"http:\/\/www.eastwindsorchamber.com\/site\/?p=3432"},"modified":"2018-09-26T10:30:33","modified_gmt":"2018-09-26T14:30:33","slug":"ctdot-announces-completion-of-a-second-rail-track-on-the-ctrail-hartford-line-between-hartford-and-windsor","status":"publish","type":"post","link":"https:\/\/www.eastwindsorchamber.com\/site\/ctdot-announces-completion-of-a-second-rail-track-on-the-ctrail-hartford-line-between-hartford-and-windsor\/","title":{"rendered":"CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE\u00a0CTrail\u00a0HARTFORD LINE BETWEEN HARTFORD AND WINDSOR"},"content":{"rendered":"<table id=\"table3\" border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td width=\"15%\"><img decoding=\"async\" src=\"https:\/\/www.ct.gov\/dot\/lib\/dot\/images\/dotlogo.gif\" \/><\/td>\n<td width=\"43%\">\n<div align=\"center\"><strong>CONNECTICUT DEPARTMENT OF TRANSPORTATION<\/strong><\/div>\n<div align=\"center\"><span style=\"font-size: medium;\"><strong>NEWS RELEASE<\/strong><\/span><\/div>\n<div align=\"center\"><\/div>\n<div align=\"center\"><strong>2800 BERLIN TURNPIKE P.O. BOX 317546<\/strong><\/div>\n<div align=\"center\"><strong>NEWINGTON CONNECTICUT, 06131-7546<\/strong><\/div>\n<\/td>\n<td width=\"15%\"><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table id=\"table4\" border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td>FOR RELEASE: September 25, 2018<\/td>\n<td>\n<div align=\"right\">FOR FURTHER INFORMATION:<\/div>\n<div align=\"right\">OFFICE OF COMMUNICATIONS<\/div>\n<div align=\"right\">TELEPHONE:\u00a0(860) 594-3062<\/div>\n<div align=\"right\">FAX: (860) 594-3065<\/div>\n<div align=\"right\">WEB SITE:\u00a0<a href=\"http:\/\/www.ct.gov\/dot\"><span style=\"color: #810081;\">www.ct.gov\/dot<\/span><\/a><\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p align=\"center\"><span style=\"font-family: Calibri;\"><b><span style=\"font-size: medium;\">CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE\u00a0<\/span><\/b><b><span style=\"font-size: medium;\">CT<i>rail<\/i><\/span><\/b><span style=\"font-size: medium;\">\u00a0<b>HARTFORD LINE BETWEEN HARTFORD AND WINDSOR<\/b><\/span><\/span><b><\/b><\/p>\n<p align=\"center\"><i><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">Both tracks now in service for passengers of the rail line<\/span><\/span><\/i><\/p>\n<p><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">The Connecticut Department of Transportation (CTDOT) today announced the completion and opening\u00a0of a second track on the CT<b><i>rail\u00a0<\/i><\/b>Hartford Line, between Hartford and Windsor. It signifies the completion of four miles of track construction as part of the current New Haven-Hartford-Springfield (NHHS) Rail Program. Some follow-up construction activity will be ongoing through mid-November.<\/span><\/span><\/p>\n<p><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">CTDOT Commissioner James P. Redeker stated, \u201cThis is another milestone for the NHHS Rail Program and the Hartford Line service. It also represents another step closer towards the 2030 vision of expanded rail passenger service in New England.\u201d<\/span><\/span><\/p>\n<p><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">The new second track provides reliability allowing trains north of Hartford to pass each other quickly and efficiently. It provides additional rail capacity that benefits both passenger and freight service, further reducing potential delays.<\/span><\/span><\/p>\n<p><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">Future phases of construction include installation of a second track between Windsor and Enfield, which is currently in design. It would connect with the existing double track between Enfield and Springfield. Also, the CTDOT is in design for new stations in North Haven, Newington, West Hartford, Windsor, Windsor Locks and Enfield, however, construction funding has yet to be secured. \u00a0CTDOT continues to seek funds for construction of these stations, as well as for the second track between Windsor and Enfield.<\/span><\/span><\/p>\n<p><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">Travelers may reference the service schedule at\u00a0<\/span><\/span><a href=\"http:\/\/www.hartfordline.com\/\"><span style=\"color: windowtext; font-size: medium;\"><span style=\"font-family: Calibri;\">www.hartfordline.com<\/span><\/span><\/a><span style=\"font-size: medium;\"><span style=\"font-family: Calibri;\">.\u00a0<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>CONNECTICUT DEPARTMENT OF TRANSPORTATION NEWS RELEASE 2800 BERLIN TURNPIKE P.O.  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_price":"","_stock":"","_tribe_ticket_header":"","_tribe_default_ticket_provider":"","_tribe_ticket_capacity":"0","_ticket_start_date":"","_ticket_end_date":"","_tribe_ticket_show_description":"","_tribe_ticket_show_not_going":false,"_tribe_ticket_use_global_stock":"","_tribe_ticket_global_stock_level":"","_global_stock_mode":"","_global_stock_cap":"","_tribe_rsvp_for_event":"","_tribe_ticket_going_count":"","_tribe_ticket_not_going_count":"","_tribe_tickets_list":"[]","_tribe_ticket_has_attendee_info_fields":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-3432","post","type-post","status-publish","format-standard","hentry","category-press-releases"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/posts\/3432","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/comments?post=3432"}],"version-history":[{"count":1,"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/posts\/3432\/revisions"}],"predecessor-version":[{"id":3433,"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/posts\/3432\/revisions\/3433"}],"wp:attachment":[{"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/media?parent=3432"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/categories?post=3432"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eastwindsorchamber.com\/site\/wp-json\/wp\/v2\/tags?post=3432"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}